Before installing the automatic edge banding machine, check whether the ground is firm and flat. It is best to install the machine on a concrete floor to ensure the stability of the machine after adjustment. At the same time, the light intensity at the installation site is required to be no less than 500LUX, and there must be sufficient space for installation, operation, access, repair and maintenance.